Cloud-led Future · Intelligence-driven Hotline +86 21 6228 0217 中文 | EN

Storage System Bids Fall Below 0.5 Yuan per Wh as Grid-Forming Weight Rises

Overview

Bids for the China Resources Shapotou 300 MW/1,200 MWh energy storage project were opened, with CRRC Zhuzhou Institute shortlisted at 0.4868 yuan per watt-hour and BYD at 0.518 yuan — the first time system prices have broken the 0.5 yuan/Wh threshold, marking a new cost range for storage systems. In parallel, China Datang launched a 5 GWh storage procurement for 2026–2027, giving grid-forming technology a 20% evaluation weight for the first time, with cell requirements of 314–700 Ah and cycle life of at least 6,000 cycles.

The simultaneous rewrite of prices and rules comes as lithium carbonate prices retreat from their May peak and system fee allocation improves, with the industry watching whether independent storage economics are nearing an inflection point.

Background & Interpretation

1. Industry background and policy context

New-type storage faced pressure on both costs and revenue in 2026: rising lithium carbonate prices in the first half lifted cell costs, while higher system operation fees eroded revenue. The turn came from two directions. Lithium carbonate fell from about 200,000 yuan per tonne in May to roughly 90,000 yuan in November — a drop of over 100,000 yuan. Meanwhile, the 15th Five-Year Plan for new-type storage calls for optimizing system fee allocation, and Zhejiang, Shandong, Shaanxi and Henan have incorporated such fees into time-of-use fluctuations.

2. Core drivers and mechanisms

On cost, the lithium decline has opened room for cell price cuts; estimates suggest every 100,000 yuan drop per tonne translates into over 0.04 yuan/Wh of savings, enough to offset higher processing fees and a 2% consumption tax. On revenue, charging independent storage entirely during off-peak hours can cut system fees by 55%–90%. Some estimates see initial equity IRR recovering from about 4% in the first half to over 7%. The rising weight for grid-forming technology reflects higher grid requirements for storage to move beyond energy shifting toward active support.

3. Market structure and value-chain impact

Integration competition has intensified: sub-0.5 yuan/Wh bids imply firms trading scale for cost and supply-chain integration for survival, squeezing smaller integrators. Cell specifications are consolidating toward 314–700 Ah with higher cycle-life thresholds, accelerating the exit of outdated capacity. Grid-forming deployment at scale creates incremental demand for PCS, control chips and grid-support algorithms, concentrating value among leading players with grid-forming capability.

Implications & Outlook

In the near term, low-price procurement will push storage plant costs lower and aid economics for independent and shared storage, though quality and long-term reliability risks from price competition bear watching. Over the medium term, as capacity pricing and system fee rules land, revenue models will diversify from pure arbitrage toward capacity compensation, spot trading and ancillary services. Rising grid-forming share is a clear direction; unified technical standards and verification systems are key.

Takeaways for Industry Participants

Integrators should shift focus from bids to levelized revenue and lifecycle reliability, differentiating through cell selection, grid-forming capability and operations strategy. Plant investors should recalculate off-peak charging and stacked-revenue models, watching provincial time-of-use and capacity rules. Equipment suppliers should accelerate large-format cell and grid-forming PCS development, capturing verification opportunities as standards take shape rather than competing on price alone.

This column compiles industry information and shares technical perspectives; it does not constitute investment advice.